Brandon, P S and Ribeiro, F L (1997) The assessment of applications for the house renovation grant system (HRGS): a multistrategy knowledge-based framework. Engineering, Construction and Architectural Management, 4(01), 41–57.

Dalgliesh, C D, Bowen, P A and Hill, R C (1997) Environmental sustainability in the delivery of affordable housing in South Africa. Engineering, Construction and Architectural Management, 4(01), 23–39.

Hughes, W (1997) Construction management contracts: law and practice. Engineering, Construction and Architectural Management, 4(01), 59–79.

  • Type: Journal Article
  • Keywords: construction management; contract drafting; law; procurement; risk apportionment
  • ISBN/ISSN: 0969-9988
  • URL: https://doi.org/10.1108/eb021040
  • Abstract:

    The context of construction management (CM) reveals that this method of procurement is as much a management philosophy as a contract structure. It is important to consider legal and contractual issues in this context. The interplay between management and law is complex and often misunderstood. Before considering specific issues, the use of contractual remedies in business agreements is discussed. In addition, the extent to which standardising a form of contract detracts or contributes to the success of projects is also considered. The dearth of judicial decisions, and the lack of a standard form, render it difficult to be specific about legal issues. Therefore, the main discussion of legal issues is centred around a recently completed research project which involved eliciting the views of a cross-section of experienced construction management clients, consultants and trade contractors. These interviews are used as the basis for highlighting some of the most important legal points to consider when setting up CM projects. The interviews revealed that the advantage of CM is the proximity of the client to the trade contractors and the disadvantage is that it depends on a high degree of professionalism and experience; qualities which are unfortunately difficult to find in the UK construction industry.

Seymour, D E, Shammas-Toma, M and Clark, L (1997) Limitations of the use of tolerances for communicating design requirements to site. Engineering, Construction and Architectural Management, 4(01), 3–22.